Thursday, October 22, 2009

 
One of the things I got done last night, most of Henry's closet floor is in and it looks like we'll have enough wood floor to finish our closet.
View of the steps from the other side of the basement. The new window will hopefully be installed next week.

Another view of the basement bedroom. The stairs on the left will be walled in and the septic aereator will be moved under the stairs. Soon, there will be a twin bed under the steps and it'll be pretty cool.
This room will soon be a bedroom (with no window, not the best thing but it'll work for now) in the basement, which is a walk out so there is your egress. My guy Mike is going to start building the walls on Saturday; the plumber was down today to replace the pipe and will finish tomorrow.

Comments: Post a Comment



<< Home

This page is powered by Blogger. Isn't yours?